ಮೇಲ್ಭಾಗ
ಡ್ಯುಯಲ್ ಕಟ್ ಪವರ್ ಸ್ವಿಚ್ನ ಕೆಲಸದ ತತ್ವ

 

STS ನ ಕೆಲಸದ ತತ್ವವು ವಿದ್ಯುತ್ ಸ್ವಿಚಿಂಗ್ ಬೇಡಿಕೆಯನ್ನು ಆಧರಿಸಿದೆ. ಮುಖ್ಯ ವಿದ್ಯುತ್ ಸರಬರಾಜು ವಿಫಲವಾದಾಗ ಅಥವಾ ವಿಫಲವಾದಾಗ, STS can automatically switch the load from the main power supply to the backup power supply to maintain continuous power supply. The main steps include: 1 Monitoring: STS will continuously monitor the status of the main power supply, including parameters such as voltage, ಆವರ್ತನ, phase, ಇತ್ಯಾದಿ. 2. Fault detection: When STS detects a fault in the main power supply or does not meet the preset working range, it will immediately respond. 3. Switching decision: STS determines whether power switching is necessary based on the fault detection results. 4. Switching operation: If it is determined that switching is necessary, STS will control the switching process. It will disconnect the main power supply and ensure that the backup power supply is ready, then connect the load to the backup power supply. 5. Switching completed: Once the switching is completed, STS will monitor the status of the backup power supply to ensure it can provide power normally. Collaboration with UPS

ಪ್ರತ್ಯುತ್ತರ ನೀಡಿ

ನಿಮ್ಮ ಇಮೇಲ್ ವಿಳಾಸವನ್ನು ಪ್ರಕಟಿಸಲಾಗುವುದಿಲ್ಲ. ಅಗತ್ಯವಿರುವ ಕ್ಷೇತ್ರಗಳನ್ನು ಗುರುತಿಸಲಾಗಿದೆ *

ಕ್ರಿಸ್ಟಿನ್ ಜೊತೆ ಚಾಟ್ ಮಾಡಿ
ಈಗಾಗಲೇ 1902 ಸಂದೇಶಗಳು

  • ಕ್ರಿಸ್ಟಿನ್ 10:12 AM, ಇಂದು
    ನಿಮ್ಮ ಸಂದೇಶವನ್ನು ಸ್ವೀಕರಿಸಲು ಸಂತೋಷವಾಗಿದೆ, ಮತ್ತು ಇದು ನಿಮಗೆ ಕ್ರಿಸ್ಟಿನ್ ಪ್ರತಿಕ್ರಿಯೆಯಾಗಿದೆ